Flue Gas Desulfurization, Lime Softening & pH Adjustment in Indianapolis, IN | RDP Technologies

Three Jobs, One Reagent: Flue Gas Desulfurization, Lime Softening, and pH Adjustment in Indianapolis

For the drug manufacturers, turbine shops, and generating stations of central Indiana, RDP Technologies designs the equipment that turns bulk lime into a reagent a process can rely on.

Set Up a Call Read the Case Studies

Lime in a City Built on Pharmaceuticals and Turbines

Indianapolis does not look like a lime market until you take the industry apart. Pharmaceutical production needs water purer than almost any other process on earth, and getting there starts with removing hardness. Aerospace component finishing generates acid waste that cannot leave a site untreated. The utility serving the city still runs scrubbed coal capacity downstate. Different buildings, different reasons, one reagent underneath. Utilities in the region are served by a separate page, our Indianapolis municipal treatment equipment page.

pH Adjustment for Pharmaceutical, Agricultural Chemical, and Aerospace Finishing Waste

pH Adjustment for Pharmaceutical, Agricultural Chemical, and Aerospace Finishing Waste

Few metros concentrate this much regulated manufacturing in one place. Drug production on the south side and out in Boone County, agricultural chemical synthesis on the west side, and turbine component work that involves plating, anodizing and chemical milling all produce streams leaving the building well outside anything a permit allows. Aerospace finishing in particular brings dissolved metals along with the acid, and Indiana IDEM writes the permits under EPA Region 5.

The reason lime remains standard across such different industries is that a single addition resolves more than one parameter. Lifting pH satisfies the discharge window while the same shift takes metals out of solution as hydroxides that can be settled and removed. What trips plants up is not selecting the chemistry but keeping up with it, because campaign based production and shift based finishing lines both send load in surges rather than at a steady rate.

Feed that adjusts itself is what holds the number. Dosing tracks plant flow or a concentration basis the site chooses, keeping effluent compliant while the load underneath moves. One circulating loop reaches every dosing location, each tapped through a pinch valve and meter of its own, and slurry in constant motion leaves no deposit behind to narrow the piping.

See How Dosing Is Controlled
Lime Softening Ahead of Purified Water Systems and Central Indiana Steam Plants

Lime Softening Ahead of Purified Water Systems and Central Indiana Steam Plants

Pharmaceutical manufacturing needs water at a purity most industries never contemplate, and the equipment that produces it, reverse osmosis trains and distillation stills, is punishingly expensive to foul. Hardness has to be removed well upstream of those units rather than at them. Plants sinking their own wells across Hamilton, Boone and Hendricks counties draw from glacial outwash over limestone bedrock and get hard water from the ground, while the downtown steam loop and the campus and hospital boiler plants face the same mineral load at a different scale.

Lime softening handles the bulk of it cheaply so the expensive equipment behind it does not have to. Adding lime pushes pH up until calcium precipitates in carbonate form and magnesium exits as hydroxide, with soda ash brought in where the noncarbonate share also has to fall. Run hot, the reaction takes silica out at the same time, which is why hot process units still stand ahead of high pressure steam rather than having been replaced.

Everything downstream was sized on an assumption about what the softener would deliver. On a Tekkem slaker each ingredient goes across load cells first, the batch is held at the temperature slaking properly finishes at, and working strength is set afterward. Feed that holds steady is what keeps that assumption true across shifts and seasons.

Inside the Slaker
Flue Gas Desulfurization Reagent Feed for Indiana Generating Stations and Kilns

Flue Gas Desulfurization Reagent Feed for Indiana Generating Stations and Kilns

The stations that once burned coal inside Marion County now run on gas, but the utility serving Indianapolis still operates scrubbed coal capacity southwest of here, and two of the largest coal plants in the country sit in the southwestern corner of this state with substantial wet desulfurization equipment on them. Indiana also quarries and burns a great deal of limestone. The cement operations and lime kilns along the stone belt running down through the south central counties are sulfur sources in their own right, and industrial boilers on higher sulfur fuel round out the picture under IDEM permits.

Two arrangements dominate the field. A wet tower washes the gas through recirculating lime or limestone and carries the captured sulfur out as a calcium solid in the blowdown. Dry and semi dry designs use no recirculation, injecting powdered reagent into the duct ahead of the collector. Reagent strength that wanders shows up on the continuous monitor as removal that wanders, and on the invoice as sorbent that did no measurable work.

Preparing it consistently is our part of the job. Metering by weight instead of by volume fixes concentration at the design figure, and one machine handles quicklime or hydrated lime without anything being swapped, which lets a plant move with supply and pricing rather than around them.

Hydrated Lime Equipment
Choosing Between Lime and Caustic Soda for Neutralization Duty

Choosing Between Lime and Caustic Soda for Neutralization Duty

Plenty of plants neutralize with caustic soda instead, and the reasoning is easy to follow. It arrives as a liquid, it needs no preparation equipment, it dissolves completely and leaves no grit, and nobody has to think about a silo. For a small intermittent stream that logic often wins outright and we will say so.

The calculation changes with volume. Caustic costs substantially more per unit of alkalinity delivered, and at industrial consumption that gap compounds into a serious annual number. Lime also brings calcium into the reaction, which matters when metals or fluoride need to be precipitated, since calcium forms the insoluble compounds that sodium simply does not. The tradeoff is that lime must be prepared on site and it does leave a solid residue to handle.

The honest version of this conversation weighs delivered cost per pound of alkalinity, what the stream actually needs precipitated out, the sludge volume each route generates, and how much handling the site can absorb. Preparation equipment is where our interest lies, so we would rather tell a plant that caustic suits its duty than sell equipment that sits underused. When the volumes justify lime, the whole argument rests on preparing it accurately.

Our Full Product Line
Documentation and Qualification Support for Regulated Manufacturing Sites

Documentation and Qualification Support for Regulated Manufacturing Sites

At a pharmaceutical or medical device site, utility equipment does not simply get installed and switched on. It gets qualified. Installation and operational verification has to be documented, instrument calibration has to be traceable, changes have to move through a controlled process, and an auditor can ask to see all of it years afterward. Equipment arriving with a one page wiring sketch creates a problem the plant's quality group then has to solve on its own time.

We build and program our own controls, which is what makes it possible to supply the documentation depth these sites need rather than passing the request to a panel subcontractor. Drawings, sequence descriptions, instrument lists and calibration records come from the people who actually designed the system.

Traceability is also easier to demonstrate on equipment that measures rather than infers. A system weighing lime and water directly produces a record of what went into each batch, instead of an estimate derived from a feeder setting. When someone asks what the reagent concentration was on a given date, the answer exists as data rather than as a reconstruction.

Project History

Start the Engineering Conversation Early

The cheapest time to get reagent handling right is before the process around it has been designed. Send us what you know so far.